Public Television Interconnection Stage 1
PBS manages the interconnection system on behalf of public television. This grant allows PBS to work through the first stage of the new interconnection system, consisting of deployment of non-linear, non-real time file delivery, as the interconnection system is being restructured to ensure efficiency, reliability and to take advantage of changes in technology.
Year:
2018Total CPB Investment:
$56,686,000Made Possible by CPB's Investment:
Public Broadcasting Service
Arlington, VA
$56,686,000
Topics:
Interconnection